DIVISION 1 GENERAL DATA - Thieneman Construction
DIVISION 1GENERAL DATA 01010-1 SECTION 01010 SUMMARY OF WORK PART 1 GENERAL SECTION INCLUDES A. Description of Existing Facilities B. GENERAL Scope of Work C. Contractor s Responsibilities D. System Operations E. Work Sequence F. Owner Occupancy G. Contract Documents DESCRIPTION OF EXISTING FACILITIES The existing Rosedale Wastewater Treatment facility consists of a 122,000 gpd (average) extended aeration package plant, chlorination (chlorine gas), dechlorination (sulfur dioxide), parshall flume metering structure and post aeration. The existing site also includes sludge drying beds, sludge holding tank, sludge transfer station, lab building and chemical building.
01010-02 C. All of the above items including site work, piping, electrical, demolition and all other incidental work necessary for construction of the project as described in the project
Download DIVISION 1 GENERAL DATA - Thieneman Construction
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
Related search queries
INFORMATION CONCERNING ENCROACHMENT PERMITS, Repairs, And repairs, Delivering Quality Potable Water to Offshore Installations, Construction, Construction, Improvements, Installations and Repairs, Improvements, Sales Tax and Home Improvements, PROJECT CATEGORIES, Unified Facilities Guide Specifications UFGS