PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: barber

DIVISION 1 GENERAL DATA - Thieneman Construction

DIVISION 1 GENERAL DATA 01010-1 SECTION 01010 SUMMARY OF WORK PART 1 GENERAL SECTION INCLUDES A. Description of Existing Facilities B. GENERAL Scope of Work C. Contractor s Responsibilities D. System Operations E. Work Sequence F. Owner Occupancy G. Contract Documents DESCRIPTION OF EXISTING FACILITIES The existing Rosedale Wastewater Treatment facility consists of a 122,000 gpd (average) extended aeration package plant, chlorination (chlorine gas), dechlorination (sulfur dioxide), parshall flume metering structure and post aeration. The existing site also includes sludge drying beds, sludge holding tank, sludge transfer station, lab building and chemical building.

01010-02 C. All of the above items including site work, piping, electrical, demolition and all other incidental work necessary for construction of the project as described in the project

Loading..

Tags:

  General, Construction, General 1

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of DIVISION 1 GENERAL DATA - Thieneman Construction

Related search queries