Document A133™ – 2019

Back to document page

Document A133 2019 Standard Form of Agreement Between Owner and construction Manager as Constructor where the basis of payment is the cost of the Work Plus a Fee with a Guaranteed Maximum Price Init. / AIA Document A133 2019. Copyright 1991, 2003, 2009, and 2019 by The American Institute of Architects. All rights reserved. WARNING: This AIA Document is protected by U. S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA Document , or any portion of i t, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. To report copyright violations of AIA Contract Documents, e-mail The American Institute of Architects legal counsel, Document has important legal consequences.

7 COST OF THE WORK FOR CONSTRUCTION PHASE 8 DISCOUNTS, REBATES, AND REFUNDS ... (Provide total and, if known, a line item breakdown.) § 1.1.4 The Owner’s anticipated design and construction milestone dates: ... The Construction Manager’s Preconstruction Phase responsibilities are set forth in Sections 3.1 and 3.2, and in the ...

  Cost, Construction, Breakdown

Download Document A133™ – 2019


Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Related search queries