PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: bachelor of science

Document A133™ – 2019

Document A133 2019 Standard Form of Agreement Between Owner and construction Manager as Constructor where the basis of payment is the cost of the Work Plus a Fee with a Guaranteed Maximum Price Init. / AIA Document A133 2019. Copyright 1991, 2003, 2009, and 2019 by The American Institute of Architects. All rights reserved. WARNING: This AIA Document is protected by U. S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA Document , or any portion of i t, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. To report copyright violations of AIA Contract Documents, e-mail The American Institute of Architects legal counsel, Document has important legal consequences.

7 COST OF THE WORK FOR CONSTRUCTION PHASE 8 DISCOUNTS, REBATES, AND REFUNDS ... (Provide total and, if known, a line item breakdown.) § 1.1.4 The Owner’s anticipated design and construction milestone dates: ... The Construction Manager’s Preconstruction Phase responsibilities are set forth in Sections 3.1 and 3.2, and in the ...

Loading..

Tags:

  Cost, Construction, Breakdown

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of Document A133™ – 2019

Related search queries