Installation Guide
SUNTUF Corrugated Polycarbonate PanelsInstallation Palram Americas 1Introduction to Suntuf 1Transportation, Handling and Storage 2Chemical Resistance and Fire Hazard Comments 2Sawing, Cutting and Drilling 2Panel Dimensions 3Suntuf Accessories 3Safety Measures 3Design Considerations and Installation Notes 3Fasteners 4ContentsMiami-Dade County, FL - Approved for Canopy ApplicationsNotice of Acceptance (NOA) #: : August 28, 2013 For all specic required details for Miami Dade approved installations, please refer to the Miami-Dade CountyNotice of Acceptance ( ) which can be downloaded at Applications 5Vertical Installation 6Greenhouse Applications 7Curved Applications 7Miscellaneous Applications 7Light Transmission for Suntuf Colors 8Load Support Data 8Warranty 8 Physical Properties 81About Palram AmericasPalram is one of the world s largest and most advanced manufacturers of polycarbonate, PVC and other thermoplastic sheets for the building industry and for the do-it-yo
their use, or if installation is in high wind area. Pre-drill all fastener holes with a 1/4" drill bit for Woodtite and Metaltite fasteners to accommodate for the thermal movement of the panel. Over-drill by an extra 1/16" for other fastener diameters. Failure to accommodate for thermal movement will cause buckling of
Download Installation Guide
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document: