INSTALLATION INSTRUCTIONS CEILING MOUNTING
INDUSTRIAL CURTAINSINSTALLATION INSTRUCTIONSGETTING STARTEDOpen all carton(s) containing hardware and remove all items. Position the hardware on the floor under the opening. Next, look in the box containing the curtain(s).Allow the curtain(s) to reach room temperature (above 50 F/10 C) before width and height of the curtain will be listed on a tag attached to the curtain. Managing Environments Phone: : Campbells Run Road Pittsburgh, PA E-Mail: Copyright 2013Catalog NumberII-ICCM-07-13NOTESCEILING MOUNTINGWHAT IS INCLUDED IN YOUR CURTAIN KIT Please check the chart below to make sure you have the correct number of TrackDoubleSplice ConnectorES-16End StopCTC-16Steel BallBearingRoller with1 HookSR-16-1NylonRoller with1 HookNR-16-14 Wheel,Steel BallBearingRoller with1 HookHDSR-16-1 CEILING SupportConnectorCSC-162 WheelRoller withConnectorP-SW-16Curtain(s) withGrommets2CC-90-16Number ofCurtainsCustom PiecesDTSC-16Straight SpliceConnectorSSC-16Ceiling Support/Splice ConnectorCSSC-16Ceiling T ConnectorDouble CeilingSupport/Splice ConnectorDCSSC-16CTCC-1690 Curved Trackwith CEILING ConnectorCeiling CornerConnector 90 CCC-167Step 6HANGING THE CURTAINPlace each curtain grommet over a roller hook and MOUNTING is complete.
WHAT IS INCLUDED IN YOUR CURTAIN KIT Please check the chart below to make sure you have the correct number of items. Total Length Straight Track
Download INSTALLATION INSTRUCTIONS CEILING MOUNTING
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document: