Transcription of INSTALLATION INSTRUCTIONS CEILING MOUNTING
{{id}} {{{paragraph}}}
INDUSTRIAL CURTAINSINSTALLATION INSTRUCTIONSGETTING STARTEDOpen all carton(s) containing hardware and remove all items. Position the hardware on the floor under the opening. Next, look in the box containing the curtain(s).Allow the curtain(s) to reach room temperature (above 50 F/10 C) before width and height of the curtain will be listed on a tag attached to the curtain. Managing Environments Phone: : Campbells Run Road Pittsburgh, PA E-Mail: Copyright 2013 Catalog NumberII-ICCM-07-13 NOTESCEILING MOUNTINGWHAT IS INCLUDED IN YOUR CURTAIN KIT Please check the chart below to make sure you have the correct number of TrackDoubleSplice ConnectorES-16 End StopCTC-16 Steel BallBearingRoller with1 HookSR-16-1 NylonRoller with1 HookNR-16-14 Wheel,Steel BallBearingRoller with1 HookHDSR-16-1 CEILING SupportConnectorCSC-162 WheelRoller withConnectorP-SW-16 Curtain(s) withGrommets2CC-90-16 Number ofCurtainsCustom PiecesDTSC-16 Straight SpliceConnectorSSC-16 CEILING Support/Splice ConnectorCSSC-16 CEILING T ConnectorDouble CeilingSupport/Splice ConnectorDCSSC-16 CTCC-1690 Curved Trackwith CEILING ConnectorCeiling CornerConnector 90 CCC-167 Step 6 HANGING THE CURTAINP lace each curtain grommet over a roller hook and MOUNTING is complete.
WHAT IS INCLUDED IN YOUR CURTAIN KIT Please check the chart below to make sure you have the correct number of items. Total Length Straight Track
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}