Installation, Operation, and Maintenance
SSAAFFEETTYY WWAARRNNIINNGGOnlyqualifiedpersonnelshou ldinstalland servicethe Installation, starting up, and servicingof heating,ventilating,andair-conditioninge quipmentcan be hazardousand requiresspecificknowledgeand ,adjustedor alteredequipmentby an unqualifiedpersoncouldresultin deathor seriousinjury. Whenworkingon the equipment,observeall precautionsin theliteratureand on the tags,stickers, and labelsthat are attached to the PackagedTerminalAir Conditioner(PTAC)ModelsPTEFandPTHFInstal lation, Operation, and Maintenance 2015 TraneAll rightsreservedPTAC-SVX002A-ENIntroductio nThe ProSpace PackagedTerminalAir Conditionersand heat pumpsprovide a high standardof qualityinperformance,workmanship,durabil ityand appearanceas they heat and cool the occupiedair manualprovidesinformationfor ease ofinstallation,operationand modelsaredesignedfor through the wall includedwith all InformationRead this manualcompletelyand carefullybeforestarting any downthe modeland serialnumberon the spaceprovidedon the modeland serialnumbercan belocatedon the serialnumberplateattached to the are requiredfor any :: Ensurethatthismanualis left ,Cautions,and Not
refrigerants must be certified. The Federal Clean Air Act (Section 608) sets forth the requirements for handling, reclaiming, recovering and recycling of certain refrigerants and the equipment that is used in these service procedures. In addition, some states or municipalities may have additional requirements that
Download Installation, Operation, and Maintenance
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document: