Handover CERTIFICATE Page: 1 of 1 Date: 24/11/03 Rev.: RD005 Project Handover Certificate CLIENT: Neil CLIENT ADDRESS: Waterways House, Grand Canal Quay, Dublin2 SITE: The George Boutique Hotel, Limerick JOB NUMBER: JN 3876 Project : George Boutique Hotel BMS Controls System 1. Commissioning Certificate Passed: Certificate Passed 2. Electrical Control Panel(s) Passed: Certificate Passed 3. All Outstanding Items Completed: See Below 4. All Commissioning Completed: Complete Outstanding Items: SF-101 Unit not operating - to be repaired by others Outstanding items listed are projected to be completed by: Items Handed Over: MCC01/02/03 and BMS front-end graphics package The above Project has been inspected by the signatories of this certificate and is taken over on behalf of the client as and from : 24-November-2006 The warranty period for the Project expires on : 25-November-2007 Clients Signature: _______________ Manutec Ltd Signature: Position: _______________________ Position: Project Manager Date: ___________________ Date: 24-November-2006
HANDOVER CERTIFICATE Page: 1 of 1 Date: 24/11/03 Rev.: 1.0 RD005 – Project Handover Certificate CLIENT: H.A.O’Neil CLIENT ADDRESS: Waterways House, Grand Canal Quay, Dublin2 SITE: The George Boutique Hotel, Limerick JOB NUMBER: JN 3876 PROJECT: George Boutique Hotel BMS Controls System 1.
Download Project Handover Cert - Manutec
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
Related search queries
AT SHIFT HANDOVER, Shift handover, Safe communication at shift handover - setting, SAFE COMMUNICATION AT SHIFT HANDOVER: SETTING, NURSING HANDOVER FOR ADULT PATIENTS GUIDELINES, Handover, S. Andrew McIntosh, Improving shift handover and maximising, LTE X2 Handover Messaging, VEHICLE INSPECTION CHECKLIST AT HANDOVER OF, Ensuring effective handover of manufacturing operations