Transcription of Project Handover Cert - Manutec
{{id}} {{{paragraph}}}
Handover CERTIFICATE Page: 1 of 1 Date: 24/11/03 Rev.: RD005 Project Handover Certificate CLIENT: Neil CLIENT ADDRESS: Waterways House, Grand Canal Quay, Dublin2 SITE: The George Boutique Hotel, Limerick JOB NUMBER: JN 3876 Project : George Boutique Hotel BMS Controls System 1. Commissioning Certificate Passed: Certificate Passed 2. Electrical Control Panel(s) Passed: Certificate Passed 3. All Outstanding Items Completed: See Below 4. All Commissioning Completed: Complete Outstanding Items: SF-101 Unit not operating - to be repaired by others Outstanding items listed are projected to be completed by: Items Handed Over: MCC01/02/03 and BMS front-end graphics package The above Project has been inspected by the signatories of this certificate and is taken over on behalf of the client as and from : 24-November-2006 The warranty period for the Project expires on : 25-November-2007 Clients Signature: _____ Manutec Ltd Signature: Position: _____ Position: Project Manager Date: _____ Date: 24-November-2006
HANDOVER CERTIFICATE Page: 1 of 1 Date: 24/11/03 Rev.: 1.0 RD005 – Project Handover Certificate CLIENT: H.A.O’Neil CLIENT ADDRESS: Waterways House, Grand Canal Quay, Dublin2 SITE: The George Boutique Hotel, Limerick JOB NUMBER: JN 3876 PROJECT: George Boutique Hotel BMS Controls System 1.
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
Ensuring effective handover of manufacturing operations, Handover, AT SHIFT HANDOVER, Shift handover, NURSING HANDOVER FOR ADULT PATIENTS GUIDELINES, Improving shift handover and maximising, Safe communication at shift handover - setting, SAFE COMMUNICATION AT SHIFT HANDOVER: SETTING, LTE X2 Handover Messaging, S. Andrew McIntosh, VEHICLE INSPECTION CHECKLIST AT HANDOVER OF