Handover CERTIFICATE Page: 1 of 1 Date: 24/11/03 Rev.: RD005 Project Handover Certificate CLIENT: Neil CLIENT ADDRESS: Waterways House, Grand Canal Quay, Dublin2 SITE: The George Boutique Hotel, Limerick JOB NUMBER: JN 3876 Project : George Boutique Hotel BMS Controls System 1. Commissioning Certificate Passed: Certificate Passed 2. Electrical Control Panel(s) Passed: Certificate Passed 3. All Outstanding Items Completed: See Below 4. All Commissioning Completed: Complete Outstanding Items: SF-101 Unit not operating - to be repaired by others Outstanding items listed are projected to be completed by: Items Handed Over: MCC01/02/03 and BMS front-end graphics package The above Project has been inspected by the signatories of this certificate and is taken over on behalf of the client as and from : 24-November-2006 The warranty period for the Project expires on : 25-November-2007 Clients Signature: _____ Manutec Ltd Signature: Position: _____ Position: Project Manager Date: _____ Date: 24-November-2006

HANDOVER CERTIFICATE Page: 1 of 1 Date: 24/11/03 Rev.: 1.0 RD005 – Project Handover Certificate CLIENT: H.A.O’Neil CLIENT ADDRESS: Waterways House, Grand Canal Quay, Dublin2 SITE: The George Boutique Hotel, Limerick JOB NUMBER: JN 3876 PROJECT: George Boutique Hotel BMS Controls System 1.

Tags:

  Project, Cert, Handover, Project handover cert

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Other abuse

Transcription of Project Handover Cert - Manutec

1 Handover CERTIFICATE Page: 1 of 1 Date: 24/11/03 Rev.: RD005 Project Handover Certificate CLIENT: Neil CLIENT ADDRESS: Waterways House, Grand Canal Quay, Dublin2 SITE: The George Boutique Hotel, Limerick JOB NUMBER: JN 3876 Project : George Boutique Hotel BMS Controls System 1. Commissioning Certificate Passed: Certificate Passed 2. Electrical Control Panel(s) Passed: Certificate Passed 3. All Outstanding Items Completed: See Below 4. All Commissioning Completed: Complete Outstanding Items: SF-101 Unit not operating - to be repaired by others Outstanding items listed are projected to be completed by: Items Handed Over: MCC01/02/03 and BMS front-end graphics package The above Project has been inspected by the signatories of this certificate and is taken over on behalf of the client as and from : 24-November-2006 The warranty period for the Project expires on : 25-November-2007 Clients Signature: _____ Manutec Ltd Signature: Position: _____ Position: Project Manager Date: _____ Date: 24-November-2006


Related search queries