RETAINING - CEDD
GEOGUIDE 1 GUIDE TO RETAINING WALL DESIGN GEOTECHNICAL ENGINEERING OFFICE Civil Engineering Department The Government of the Hong Kong Special Administrative Region 2 The Government of the Hong Kong Special Administrative RegionFirst published, September 19821st Reprint, January 19832nd Reprint, July 19833rd Reprint, October 19854th Reprint, January 19875th Reprint, April 1990Second Edition, October 1993Reprinted with minor correction, November 1994Reprinted, January 1998Reprinted, August 2000Prepared by:Geotechnical Engineering Office,Civil Engineering Department,Civil Engineering Building,101 Princess Margaret Road,Homantin, Kowloon,Hong Committee:E. W. Brand (before April 1989)A. W. MaloneK. C. Brian-Boys (before December 1988) Lam (before October 1989)J.
Kong, including conventional reinforced concrete walls, gravity walls such as crib walls, ... 5.7 SOIL PERMEABILITY AND CONSOLIDATION PARAMETERS 5.7.1 Permeability ... 8.2.2 Evaluation of Water Pressures 8.3 EFFECTS OF WATER ON EARTH PRESSURES
Download RETAINING - CEDD
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document: