RISK ASSESSMENT & METHOD STATEMENT
RISK ASSESSMENT & METHOD STATEMENTRAMS No. Title: Rev No. 01 Water Treatment Building Demolition 01 Site Name & Number: Portobello Wastewater Pumping StationSite Location: A259 Telscombe Cliffs, Peacehaven, BN10 7BE Client: Document Revision / Authorisation Record Revision No# Prepared by Positon Date Authorised by Positon Date Details 01 L. BatchfordH&S Manager31/01/19 G. WilliamsContracts Manager 31/01/19 First Issue 02 03 Page 1 of 38 Doc Name: RAMS: Peacehaven Issue Date: 03/01/2019 Rev: 01 Location: Z-Drive: PeacehavenAuthor: LB Contents Section 01 Site Particulars Scope of Works House of Work Constraints to WorkSection 02 Access / Egress Site Access Workface AccessSection 03 Resources Labour Plant & Equipment MaterialsSection 04 Methodology METHOD Summary METHOD SequenceSection 05 PPE Section 06 Competency / Supervision Section 07 Permits Section 08 Emergency Arrangements Section 09 Risk Assessments Section 10 Briefing Sheet Page 2 of 38 Doc Name: RAMS: Peacehaven Issue Date: 03/01/2019 Rev: 01 Location: Z-Drive: PeacehavenAuthor: LB ParticularsScope of Works.
• Safety Signage is to be displayed before entering the Demolition Zone, with workplace Fire Points, Spill Kits, and COSHH Storage established before work. • A waste segregation area will be set out with appropriate signage. This area will be for the segregation of the different waste streams such as WEEE, metal, concrete, etc.
Download RISK ASSESSMENT & METHOD STATEMENT
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document: