RefDescriptionQtyUnitRateAmountSUBSTRUCT URESGROUNDWORKD20 EXCAVATING AND FILLINGEXCAVATINGTo reduce m maximum m maximum m maximum depth11m3Trenches exceeding 300 m maximum depth29m3Extra over excavation irrespective of depth forexcavatingESoft spots; removal and backfilling with Type 225m3granular material (provisional item andquantity)Extra over excavation irrespective of depth forbreaking outFCoated macadam or asphalt paving 75 thick627m2EARTHWORK SUPPORTTo faces of m maximum depth distance between150m2opposing faces not exceeding m maximum depth distance between154m2opposing faces 2 to m maximum depth distance between15m2opposing faces 2 to 4mDISPOSALKSurface water1ItemExcavated materialLOff site706m3Page : 2/1To CollectionRefDescriptionQtyUnitRateAmoun tSUBSTRUCTURES (Cont'd) GROUNDWORK (Cont'd)D20 EXCAVATING AND FILLING (Cont'd)AOff site (provisional item and quantity)25m3GRANULAR MATERIAL SPEC 618Filling to make up levelsBNot exceeding 250 average thick obtained off72m3siteSURFACE TREATMENTSCCompacting filling.
FACING BRICKWORK SPEC 110B Walls A 102.5 mm thick 34 m2 BLOCKWORK SPEC 355 Walls B 140 mm thick 57 m2 C 215 mm thick; blocks laid flat 16 m2 F30 ACCESSORIES/SUNDRY ITEMS FOR BRICK/BLOCK/STONE WALLING SUNDRIES Forming cavities in hollow walls D 150 wide; wall ties as specification 46 m2 WATERPROOFING J40 …
Download SUBSTRUCTURES GROUNDWORK D20 EXCAVATING AND …
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document: