Technical Installation Information
Technical Installation Information IMPORTANT NOTICE. READ THIS MANUAL COMPLETELY PRIOR TO BEGINNING THE Installation OF THE Double-Lok . ROOFING SYSTEM. ALWAYS INSPECT EACH AND EVERY PANEL AND ALL ACCESSORIES BEFORE Installation . NEVER INSTALL ANY PRODUCT IF ITS QUALITY IS IN QUESTION. NOTIFY MBCI IMMEDIATELY IF ANY. PRODUCT IS BELIEVED TO BE OUT OF TOLERANCE, SPECIFICATION OR HAS BEEN DAMAGED. DURING SHIPMENT. IF THERE IS A CONFLICT BETWEEN PROJECT ERECTION DRAWINGS PROVIDED OR APPROVED BY. THE MANUFACTURER AND DETAILS IN THIS MANUAL, PROJECT ERECTION DRAWINGS WILL TAKE. PRECEDENCE. Ice Dam Disclaimer MBCI designs its standing seam roofs to meet the load requirements dictated by governing codes and project specifications, including applicable snow loads. However, NCI expressly disclaims responsibilty for weathertightness or roof point loading issues or other hazards resulting from ice dam situations. Any time ice and snow can melt on the main body of the roof and refreeze at the eave or in the shadow of an adjacent wall, an ice dam situation may develop.
Descriptions and specifications contained herein were in effect at the time this publication was approved for printing. In a continuing effort to refine and improve products, MBCI reserves the right to discontinue products at any time or change specifications and/or
Download Technical Installation Information
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
Related search queries
CONTROL JOINTS FOR CONCRETE MASONRY, NCHRP 25-25/Task 72, NCHRP 25-25 Task 72, Effects, Reading the Fire B-SAHF, Of building, Plate Tectonics, Virginia Department of Education, Movement, CHAPTER 16 STRUCTURAL DESIGN, Analysis of Changes for the, Florida Building, Building, Technical Note: Water Vaper Permeance of Wood, Curtainwall