WORK BREAKDOWN STRUCTURES FOR DEFENSE …
NOT MEASUREMENT SENSITIVE MIL-HDBK-881A 30 JULY 2005 SUPERSEDING MIL-HDBK-881 2 JANUARY 1998 DEPARTMENT OF DEFENSE HANDBOOK work BREAKDOWN STRUCTURES FOR DEFENSE MATERIEL ITEMS This handbook is for guidance only. Do not cite this document as a requirement. AMSC N/A AREA MISC MIL-HDBK-881A (THIS PAGE LEFT INTENTIONALLY BLANK)MIL-HDBK-881A i FOREWORD 1. This handbook is approved for use by all Departments and Agencies of the Department of DEFENSE . It is for guidance only and should not be included as a contract requirement. 2. This handbook addresses mandatory procedures for those programs subject to DoD Instruction It also provides guidance to industry in extending contract work BREAKDOWN STRUCTURES . 3. A work BREAKDOWN structure (WBS) provides a consistent and visible framework for DEFENSE materiel items and contracts within a program.
MIL-HDBK-881A 1 1. GENERAL INFORMATION 1.1 Handbook Purpose And Structure. This handbook presents guidelines for effectively preparing, understanding, and presenting a Work Breakdown Structure (WBS).
Download WORK BREAKDOWN STRUCTURES FOR DEFENSE …
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
Related search queries
Glossary of Software Engineering Terms, PMBOK GLOSSARY, Work Breakdown Structure, Work, Element, ASSUMPTION MANAGEMENT Purpose, Scheduling, Estimating, Project/Construction, Scheduling, Estimating, Project/Construction Management, Work to be Performed Work, Standard for Earned Value, Standard for Earned Value Management Systems Intent, AD-A248 GLOSSARY, Defense Technical, AD-A248, GLOSSARY