BQE Atlantic to Sands Project Update - New York City
Commissioner Polly Trottenberg, New york city Department of TransportationNovember 1, 2016BQE Atlantic to Sands Project Update 2THE Project TEAMRobert Collyer, Commissioner for BridgesTanvi Pandya, Senior Program ManagerKeith Bray Brooklyn Borough CommissionerJoannene Kidder Executive Director of Community AffairsFor questions and concerns:Email: NYS Highway System Built vs. Unbuilt2. Recent Pavement Repairs3. In Depth Inspection Findings Concrete Arches Multigirder Structures Cantilever Structures4. Ongoing Traffic Study5. Upcoming Steps4THE 21 BRIDGESAtlantic Avenue Interchange 5NYS HIGHWAY SYSTEM BuiltArterials and highway systems meeting current standards and included in NYS BuiltExisting or proposed main routes that have not been upgraded to current standards or included in NYS Highway Law Section 349 Established List of Routes to be included in the system (passed in the 1940s)6RECENT PAVEMENT REPAIRSSections of the BQE roadway were repaired and repaved during the overnight hoursQueensbound: July 19 July 23Staten Island bound: July 24 July 31Base RepairMilled Surface7IN DEPTH INSPECTION Inspection Goals Identify issues needing immediate intervention Determine strength and useful life of BQE bridges Inspection Findings No immediate concerns, including the triple cantilever di
Commissioner Polly Trottenberg, New Yo rk City Department of Transportation November 1, 2016 BQE Atlantic to Sands Project Update
Download BQE Atlantic to Sands Project Update - New York City
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document: