DESIGN GUIDE AL #1 BRIDGES FOR LIVESTOCK AND ... - USDA
DESIGN GUIDE AL #1 BRIDGES FOR LIVESTOCK AND AGRICULTURAL EQUIPMENT CONSTRUCTION DETAILS AND SPECIFICATIONS Alabama (adopted from Maryland NRCS) May 2012 DESIGN GUIDE AL #1 Agricultural Bridge Crossings NRCS Engineering, Alabama May 2012 Page i TABLE OF CONTENTS SECTION PAGES I. General Information ........................................ ........................................ ................................... 1 General ........................................ ........................................ ........................................ ........ 1 DESIGN ........................................ ........................................ ........................................ ......... 1 Site Selection ........................................ ........................................ ...................................... 2 Procedure.
In order for the bearing pads to function properly, several things must be considered when siting the bridge location. ... (from top of pad to stream bottom) horizontal projection from the toe of streambank. This is a minimum projection. In areas where the stream bank slope is flatter than 1.5:1, increase the ... and set adjacent to the beam ...
Download DESIGN GUIDE AL #1 BRIDGES FOR LIVESTOCK AND ... - USDA
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document: