Chapter 6: Installation and Construction
6ChapterInstallationandConstructionLeste r H. Gabriel, , 6: Installation AND CONSTRUCTIONThis Chapter provides information on the handling and Installation of corrugatedpolyethylene pipe and fittings in non-pressure applications including most sewers,culverts and subdrainage systems. All types of pipe, regardless of material, must beinstalled as specified to perform as Department of Labor, Occupational Safety and Health Administration (OSHA), Safety and Health Regulations for Construction requires observance of its safety andother guidelines during all phases of Construction including foundation preparation,excavation, pipe handling, assembly and backfilling.
or filter fabrics, may be considered in areas where the native soil is very soft and/or migrates easily. Geotextiles designed for strength and stability may help overcome some of the structural deficiencies in soft native soils and allow reductions in trench widths. They may also be placed on the trench bottom and sides to separate native
Download Chapter 6: Installation and Construction
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document: