Example: confidence
Search results with tag "Cad amp bim standards"
CAD & BIM Standards Manual
popcdn.azureedge.net• All drawings shall be plotted full size, stamped, and wet signed. Note: All drawing stamps and signatures must comply with OAR and ORS requirements. • The drawings shall meet the CAD and printing standards described in this manual. • See the Reprographics section for further requirements. Addenda