PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: tourism industry

Search results with tag "Division 200 earthwork section 201 clearing"

DIVISION 200 – EARTHWORK SECTION 201 – CLEARING

www.in.gov

If clearing and grubbing is specified as a lump sum pay item, no measurement of area will be made. 80 (c) Individual Unit Basis 1. The diameter of trees will be measured at a height of 24 in. above the ground. Trees of less than 4 in. in diameter will be classified as brush. 2. Stumps will be measured by determining the average diameter

  Section, Time, Unit, Division, Clearing, Average, Earthwork, Division 200 earthwork section 201 clearing

Similar queries