Search results with tag "Erecting"
Scaffold Erecting and Dismantling Procedure
www-group.slac.stanford.eduThe purpose of this procedure is to ensure scaffolding is adequate for the work to be performed and properly erected and dismantled. It covers selecting, erecting, and dismantling all types of scaffolds.
HEALTH & SAFETY RISK ASSESSMENTS
www.newcastle.edu.auBefore installing, commissioning or erecting plant or equipment; • Whenever changes are made to the: o Workplace; o System or method of work; o Plant or equipment used; o Materials used; • Whenever new information regarding work processes becomes available. If you require more information, please scroll over the tip button at the bottom of the
State of New Jersey
www.nj.govconstruction materials, supplies, and services made by a contractor that is erecting new structures or “substantially improving, altering, or repairing” the property of a qualified business. “Substantially improving, altering, or repairing a property” is defined as a project with a total cost that equals or exceeds
SUSTAINABLE WILDLIFE MANAGEMENT IN ZIMBABWE
www.fws.gov• Other communities have drilled boreholes, constructed seasonal roads, erecting of fencing to keep out wildlife, purchase of tractors, and direct purchase of drought relief food. • Children benefit from reduced walking distances through the construction of schools,
A sample lockout/tagout policy for your workplace
osha.oregon.govmaintenance includes erecting, installing, constructing, repairing, adjusting, inspecting, unjamming, setting up, trouble-shooting, testing, cleaning, and dismantling machines, equipment or processes. This policy will ensure that machinery or equipment is stopped, isolated from all hazardous energy sources, and properly locked or tagged out. Scope
Building Work Contractors Act 1995
www.legislation.sa.gov.au(a) the whole or part of the work of constructing, erecting, underpinning, altering, repairing, improving, adding to or demolishing a building; or (b) the whole or part of the work of excavating or filling a site for work referred to in . paragraph (a); or
Scaffold Erecting and Dismantling Procedure
www-group.slac.stanford.eduSLAC Environment, Safety, and Health Manual (SLAC-I-720-0A29Z-001) Chapter 15, “Ladder and Scaffold Safety” – Ladder and Scaffold Safety: Scaffold Use Procedure (SLAC-I-730-0A21C-029) – Ladder and Scaffold Safety: Scaffold Purchasing Procedure (SLAC-I-730-0A21C-028) Chapter 2, “Work Planning and Control”
ERECTING, ALTERING AND DISMANTLING SCAFFOLDING
www.australianscaffolds.com.au4 3. SCOPE This industry safety standard covers the erecting, altering and dismantling of prefabricated steel modular scaffolding not exceeding 20 metres high, erected with all …