PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: quiz answers

2945 INDICATOR POSTS - Kennedy Valve

Kennedy VALVET elescoping post IndicatorWall PostISO 9000 ISO 14001 Telescoping post IndicatorFIELD ADJUSTMENT INSTRUCTIONS1. Remove the top section from the INDICATOR post Loosen the telescoping barrel screw and adjust barrel to the ground Cut the 1 square stem at a distance of 9 above the top of the barrel Set the OPEN and SHUT targets for the appropriate Valve Reattach the top section to the top of the INDICATOR post = 10"MIN. = 7"1" SQUARE STEM 9" TELESCOPING BARREL 2945A TRENCH DEPTH LIMITSB SIZEC SIZED SIZEE 31 51 49 69 67 87 88 111 6 35 55 53 73 71 91 92 115 8 42 62 60 80 78 98 99 122 10 45 65 63 83 81 101 102 125 12 49 69 67 87 85 105 106 129 14 58 78 76 96 94 114 115 138 2945 AUpdated 4/4/2014 INDICATOR post Parts ListPARTS LISTDETQTYPART WRENCH

indicator post parts list parts list det qty part no. description material p-1 1 3361270 locking wrench cast iron astm a126 class b p-2 1 3024872

Tags:

  Post, Indicator, 2549, 2945 indicator posts

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of 2945 INDICATOR POSTS - Kennedy Valve

Related search queries