PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: biology

ACACA PROTOCOL™ 2000 - amei.com.au

ACACA PROTOCOL 2000(AS AT 31st MARCH, 2002) ACACA PROTOCOL 2000 INCLUDES (A) CODE OF PRACTICE FORMANUFACTURERS AND/OR SUPPLIERS OF COMMERCIAL AIRCOMPRESSORS AND METHOD FOR DETERMINING (B) RECIPROCATINGAIR COMPRESSOR PUMP DISPLACEMENT (C) FREE AIR DELIVERY OFAN AIR COMPRESSOR PACKAGE WITH A PUMP DISPLACEMENT OF UPTO 600 LITRE/MINUTE AND (D) TEST of ContentsA. Code of PracticePage 2B. Pump DisplacementPage Air Delivery (FAD) of Air CompressorPage 3 (i) Pump Up Test (Simplified Method)Page 3 (ii) General Pump Up FormulaPage 4 (iii) Specific ACACA Pump Up Test MethodPage 4 (iv) Calculation of FADPage 4 (v) Protocol 2000 FAD Standard Testing ProcedurePage 5D. Test Report RecordPage OF PRACTICEM embers of the Australian Commercial Air Compressor Association agree to :i) Actively promote the aims and objectives of ACACA in the market, andto other suppliers in the ) To manufacture and/or supply air compressors which are safe to useand which comply with both Federal and State Government regulationsin respect of workplace, electr

5 P2 – P1 = 800 kPa – 600 kPa = 200 kPa (2 Bar) P0 = 1 Bar (100 kPa) Then FAD = T 2V V – The air receiver capacity in litres. This must be verified by filling the air receiver with water and measuring the volume of water in litres, to

Loading..

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of ACACA PROTOCOL™ 2000 - amei.com.au

Related search queries