Transcription of An Assessment for Five Severe Accident Risks: An ...
{{id}} {{{paragraph}}}
NUREG-1150 Vol. 1An Assessment for FiveSevereAccident Risks: An Assessment for nuclear power PlantsFinal Summary nuclear RegulatoryCommissionOffice of nuclear regulatory ResearchAVAILABILITY NOTICEA vailability of Reference Materials Cited in NRC PublicationsMost documents cited in NRC publications will be available from one of the followingsources:1. The NRC Public Document Room, 2120 L Street, NW, Lower Level, Washington, DC205552. The Superintendent of Documents, Government Printing Office, Box 37082,Washington, DC 20013-70823. The National Technical Information Service, Springfield, VA 22161 Although the listing that follows represents the majority of documents cited in NRC publica-tions, it is not intended to be documents available for inspection and copying for a fee from the NRC PublicDocument Room include NRC correspondence and internal NRC memoranda; NRC Office ofInspection and Enforcement bulletins, circulars, information notices, inspection and Investi-gation notices; Licensee Event Reports; vendor reports and correspondence; Commissionpapers; and applicant and licensee documents and following documents in the NUREG series are available for purchase from the GPO SalesProgram: formal NRC staff and contractor reports, NRC-sponsored conference proceed-ings, and NRC booklets and brochures.
NUREG-1150 Vol. 1 An Assessment for Five Severe Accident Risks: An Assessment for Five U.S. Nuclear Power Plants Final Summary Report U.S. Nuclear Regulatory Commission
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
TELESCOPIC HANDLERS, Plant, Power, Operator, Presentation of 25MW Biomass Power Plant in, Presentation of 25MW Biomass Power Plant in Kozani, POWER ENGINEERS REGULATION, Power plant, General plant & equipment, Solar Plant Dynamic, Solar Plant Dynamic Modeling Guidelines, 7968 IT2FLC based Control Model of