Transcription of API Recommended Practice 2A-WSD
{{id}} {{{paragraph}}}
API Recommended Practice 2A-WSDP lanning, Designing, and Constructing Fixed Offshore Platforms Working Stress design TWENTY-SECOND EDITION | NOVEMBER 2014|310 PAGES|$ | PRODUCTNO. G2 AWSD22 This Recommended Practice is based on global industry best practices and serves as a guide for those who are concerned with the design and construction of new fixed offshore platforms and for the relocation of existing platforms used for the drilling, development, production, and storage of hydrocarbons in offshore areas. This publication serves as a guide for the design and construction of new platforms and for the relocation of existing platforms used for the drilling, development, and storage of hydrocarbons in offshore areas. In addition, these guidelines shall be used in conjunction with API 2 SIM for the assessment of existing platforms in the event that it becomes necessary to make a determination of the fitness-for-purpose of the structure.
API Recommended Practice 2A-WSD Planning, Designing, and Constructing Fixed Offshore Platforms—Working Stress Design TWENTY-SECOND EDITION | NOVEMBER 2014| 310 PAGES | $395.00 | PRODUCT NO.
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
Recommended Practice For Design and Construction, Design, Concrete Parking Lot Design & Construction, Concrete Parking Lot Design & Construction Specifications, Design and Construction, Design and Construction of Stormwater Management Systems, Ordering Information, Recommended, API Recommended Practice 538, 97: Cost Estimate Classification System, Cost Estimate Classification System, Design and Construction Process for Swimming, Design and Construction Process for Swimming Pools, RECOMMENDED STANDARDS for WASTEWATER, Recommended standards . for. wastewater