Transcription of Appendix C: Cost Estimating Methodologies
{{id}} {{{paragraph}}}
NASA Cost Estimating Handbook Version Appendix C Cost Estimating Methodologies C-1 February 2015 Appendix C: Cost Estimating Methodologies The cost estimator must select the most appropriate cost Estimating methodology (or combination of Methodologies ) for the data available to develop a high quality cost estimate. The three basic cost Estimating methods that can be used during a NASA project s life cycle are analogy, parametric, and engineering build-up (also called grassroots ) as well as extrapolation from actuals using earned value management (EVM). This Appendix provides details on the following three basic cost Estimating methods used during a NASA project s life cycle: Analogy Cost Estimating Parametric Cost Estimating Simple Linear Regression (SLR) Models Simple Nonlinear Regression Models Multiple Regression Models (Linear and Nonlinear) Model Selection Process Summary: Par
from actuals using Earned Value Management (EVM). Figure C-1. Use of Cost Estimating Methodologies by Phase1 When choosing a methodology, the analyst must remember that cost estimating is a forecast of future costs based on the extrapolation of available historical cost and schedule data. The type of cost
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}