Transcription of BACKFLOW PREVENTION ASSEMBLY TESTING MANUAL
{{id}} {{{paragraph}}}
BACKFLOW PREVENTION ASSEMBLYTESTING MANUALLos Angeles County Department of Public HealthEnvironmental ProtectionCross-Connection and Water Pollution Control ProgramTABLE OF CONTENTSTESTING TECHNIQUES .. 1-2 CONCEPTS OF BACKFLOW PREVENTIONASSEMBLY TESTING .. 3-4 SINGLE CHECK TYPE PRESSURE VACUUM BREAKERTUBE TEST PROCEDUREAir Inlet Opening Point .. 5-6 Check Valve Operation .. 7 TWO CHECK TYPE PRESSURE TYPE VACUUM BREAKERTUBE TEST PROCEDUREAir Inlet Operation .. 8-9 Check Valve Operation .. 10-11 DOUBLE CHECK VALVE ASSEMBLIESTUBE TEST PROCEDUREC heck Valve Operation .. 12-13 SINGLE CHECK PRESSURE TYPE VACUUM BREAKERGAUGE TEST PROCEDUREAir Inlet Operation .. 14-15 Check Valve Operation .. 16 SPILL-RESISTANT PRESSURE VACUUM BREAKERGAUGE TEST PROCEDUREAir Inlet Opening Point .. 17-18 Check Valve Closing Point .. 18 TWO CHECK PRESSURE TYPE VACUUM BREAKERGAUGE TEST PROCEDUREAir Inlet Operation .. 19 Check Valve Operation .. 20-21 DOUBLE CHECK VALVE BACKFLOW PREVENTION ASSEMBLYGAUGE TEST PROCEDUREC heck Valve #1 Operation.
procedures described under DOUBLE CHECK VALVE ASSEMBLIES. NOTE: While the use of water columns (tubes) for field test reporting purpose has been eliminated, testers will still be required to demonstrate proficiency in tube testing of double check valve assemblies and pressure type vacuum breakers at the time of certification and recertification.
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}