1 BEFORE THE HON BLE CENTRAL ELECTRICITY REGULATORY COMMISSION Case No. 420/MP/2014 IN THE MATTER OF: PETITION FOR ENDANGERING GRID SECURITY DUE TO NON-IMPLEMENTATION OF CONTINGENCY DEMAND DISCONNECTION SCHEME FOR SUDDEN LOSS OF WIND GENERATION AS PER CERC ORDER DATED , NON-AVAILABILITY OF LVRT PROTECTION, NON-SCHEDULING OF WIND GENERATION AS PER CERC (INDIAN ELECTRICITY GRID CODE) REGULATIONS, 2010 (IEGC) (I), LACK OF NECESSARY DEMAND ESTIMATION AS PER IEGC REGULATIONS AND NOT PROVIDING REAL-TIME SCADA DATA TO LDC. AND IN THE MATTER OF: SOUTHERN REGIONAL LOAD DESPATCH CENTRE ..PETITIONER VERSUS TAMIL NADU STATE LOAD DEPATCH CENTRE & ORS ..RESPONDENTS WRITTEN SUBMISSIONS ON BEHALF OF INDIAN WIND TURBINE MANUFACTURERS ASSOCIATION MOST RESPECTFULLY SHOWETH: Indian Wind Turbine Manufacturers Association being one of the stake holders in the above mentioned case respectfully submits as under for the kind consideration of this Hon ble Commission: 2 A.
3 Where V T /V N is the ration of the actual voltage to the nominal system voltage at the interconnection point Provided that during the voltage dip, the generating units in the generating station shall generate active power in proportion to the
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
POWER GENERATING COMPANY LIMITED, PORT QASIM ELECTRIC POWER COMPANY, Port qasim electric power company (private) limited, Company, POWER LIMITED, Power Company Limited, Power, Safety Executive Case study: Scottish, Safety Executive Case study: Scottish Power Power, Losses in Electrical Power System, Generating, GENSET, LIMITED, Belize Electricity Limited, Coal-Fired Power Plant Construction Costs, Power transformer maintenance. Field Testing