Page 1 of 18 DESCRIPTIONUNIT PRICETOTALSECTION ONE - COMMON ITEMSMOBILIZATION1 FOR MOBILIZATION TO THE PROJECT SITE, AS SPECIFIEDA"TYPE A" MOBILIZATION (THIS ITEM IS LIMITED TO 3% OF THE TOTAL BID AMOUNT)1LS$80, $80, "TYPE B" MOBILIZATION (THIS ITEM IS LIMITED TO 50% OF THE "TYPE A" BID AMOUNT)1EA$8, $8, "TYPE C" MOBILIZATION (THIS ITEM IS LIMITED TO 15% OF THE "TYPE A" BID AMOUNT)15EA$8, $120, EXCAVATION2 FOR SOLID ROCK EXCAVATION, AS SPECIFIEDAFOR THE FIRST 25 CY ROCK EXCAVATION PER PROJECT 40CY$ $4, ADDITIONAL ROCK EXCAVATION AFTER THE INITIAL 25 CY PER PROJECT160CY$ $9, STABILIZATION3 FOR STONE STABILIZATION MATERIAL AS SPECIFIED, COMPLETE IN PLACE10TN$ $ PAVEMENT4 FORCUTTING(SAWING),MILLINGAND REPLACINGALLASPHALTICPAVEMENT ASSPECIFIED, COMPLETE IN PLACEAFOR CUTTING (SAWING) ASPHALT PAVEMENT5,400LF$ $5, REMOVING AND DISPOSING OF ASPHALT PAVEMENTa1-INCH DEPTH1,300SY$ $5, REPLACING ASPHALT
tunnelling 21: for installing 48' tunnel (12 gauge), anchoring the carrier pipe, and and necessary mortar end sealing as specified, complete in place. the unit price bid shall not be less than $700.00/lf. a 48-inch tunnel 20: lf $800.00
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}