Transcription of Bill of Quantities (BoQ) ITB2013208 - UNDP
{{id}} {{{paragraph}}}
bill of Quantities (BoQ)Refurbishment of a forensic laboratory in RamallahITB 2013 Unit Rate US$ Total US$ 1 Demolishing WorksPreamble:The contractor should be aware that the proposed work will be carried out in the existing functioning building and that the his daily activities shall not interrupt others ongoing daily activities in the other floors of the existing building. Unit rates shall include, but not limited to, the following:a. Removing of demolished material out of site to an approved dump The dismantled material are the sole properties of the The contractor shall coordinate implementation of his daily work activities, working hours, throughout the construction period with the client and the supervising engineerd.
Bill of Quantities (BoQ) Refurbishment of a forensic laboratory in Ramallah ITB2013208 No. Description Unit Qty Unit Rate US$ Total US$ 1 Demolishing Works Preamble: The contractor should be aware that the proposed work will be
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}