C/AS2 Acceptable Solution for ... - Building Performance
PerFormance c2.2 The maximum surface temperature of combustible building materials close to fixed appliances using controlled combustion and other fixed equipment when operating at their design level must not exceed 90°C. c2.3 Fixed appliances using controlled combustion and other fixed equipment must be designed, constructed and
Tags:
Performance, Building, Performance buildings
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
Documents from same domain
Constructing Cavities - Building Performance
www.building.govt.nzTable 23 (’Properties of roof underlays and building wraps‘). Install the wall underlay directly over the framing. Install the cavity battens directly over the wall underlay as described in Cavity battens on page 9. No additional wall underlay is needed between the wall cladding and the cavity battens except in the following situations.
Building, Constructing, Wrap, Cavities, Building wraps, Constructing cavities
C/AS2 - Acceptable Solution for Acceptable Solution for ...
www.building.govt.nzC/AS2 Acceptable Solution for Buildings with Sleeping (non institutional) (Risk Group SM) For New Zealand Building Code Clauses C1-C6 Protection from Fire
E2 External Moisture
www.building.govt.nzFor single- and two-storey concrete and concrete masonry construction within specific limitations: E2/AS3. For light steel framed buildings up to 3 storeys, within specific limitations: E2/AS4. E2.3.3 Ground contact or proximity All walls, floors and structural elements in ground contact or proximity, except for buildings where external
Building work that does not require a building consent
www.building.govt.nzGUIDANCE Building Act 2004 THIRD EDITION 2014 - AMENDED AUGUST 2017 Building work that does not require a building consent
Earthquake geotechnical engineering practice
www.building.govt.nzEarthquake geotechnical engineering is a highly specialised field. As such the investigations for this need to be developed and carried out by an appropriately qualified and experienced geotechnical engineer or engineering geologist (referred to herein as the geotechnical professional). For the purposes of this document ‘geotechnical
Module 6: Earthquake resistant retaining wall design
www.building.govt.nzguidance on earthquake design aspects for retaining . structures that are not well covered in these handbooks or elsewhere. The main objective is to identify situations where seismic design of retaining structures should be considered, to provide the necessary seismic parameters, and to identify key issues relating to seismic design.
Design, Seismic, Structure, Walls, Module, Resistant, Seismic design, Retaining, Earthquake, Module 6, Retaining structures, Earthquake resistant retaining wall design
Worked Example 4 | Design of a tied-back retaining wall to ...
www.building.govt.nzDesign of a tied-back retaining wall to resist earthquake loading . Worked example to accompany MBIE Guidance on the seismic design of retaining structures for residential sites in Greater Christchurch (Version 2) November 2014 . Tied-back retaining walls were used originally as a substitute for braced retaining walls in deep excavations.
Design, Seismic, Structure, Walls, Loading, Seismic design, Retaining, Earthquake, Sisters, Retaining structures, Retaining wall to resist earthquake loading
Acceptable Solutions and Verification Methods
www.building.govt.nz4.2 Sizing of downpipes 42 4.3 Installation of downpipes 42 5.0 Roof Gutters 42 5.1 Size of roof gutter 42 5.2 Materials44 5.3 Gradients44 5.4 Thermal movement 44 5.5 Overflow outlets 44 Appendix A Rainfall intensities 45 Index 47 Contents Amend 4 Dec 2000 Amend 4 …
Verification, Solutions, Methods, Acceptable, Roof, Appendix, Sizing, Acceptable solutions and verification methods
Acceptable Solutions and Verification Methods
www.building.govt.nz4.2 Sizing of downpipes 42 4.3 Installation of downpipes 42 5.0 Roof Gutters 42 5.1 Size of roof gutter 42 5.2 Materials44 5.3 Gradients44 5.4 Thermal movement 44 5.5 Overflow outlets 44 E1/AS1 Appendix A Rainfall intensities 45 Acceptable Solution E1/AS2 52 1.0 AS/NZS 3500.3 Stormwater Dec 2000 drainage52 Index 56 Contents Amend 4
Verification, Solutions, Methods, Acceptable, Roof, Appendix, Sizing, Acceptable solutions and verification methods
Commentary for Acceptable Solutions C/AS1 to C/AS7 ...
www.building.govt.nzDecember 2013. Contents Acceptable Solutions C/AS1 to C/AS7 Part 1: General 2 ... 4.11 Protected shafts 31 4.13 Floors 32 4.14 Subfloor spaces 32 ... INNOVATION AND EMPLOYMENT – 15 FEBRUARY 2013 I 1 Part 5: Control of external fire spread 34 5.1 General principles 34 5.2 Horizontal fire spread from external walls 36 5.5 Table method for ...
Related documents
Simple House Acceptable Solution - Building Performance
www.building.govt.nzBuilding Code or otherwise in the Definitions at the end of this Acceptable Solution. siMple house: Document history Date alterations First published 31 March 2010. contents siMple house DepartMent of BuilDing anD housing, 31 March 2010 3 …
IMPROVING PRODUCTIVITY IN THE WORKPLACE - Emcor
www.emcoruk.comBuilding Performance Ltd, and has designed, constructed and operated over £3.5 billion worth of real estate. John and LCMB’s aim is to make a difference by making buildings work harder for their clients, their staff, customers and society. Alastair Howard is a research associate in the Low
DuPont Tyvek Water-Resistive and Air Barriers Residing ...
www.dupont.comDuPont Performance Building Solutions For Buildings Less Than 5 Stories and Low-Rise Multi-Family Residential Buildings Less Than 6 Stories. ... performance requirements of 65 mph equivalent structural load resistance and 15 mph equivalent …
Sample Capacity Building Plan - managementhelp.org
managementhelp.orgSample Capacity Building Plan DRAFT Rev 1.0 3 Description This Plan is the result of applying an organizational performance management process to our organization
Performance, Building, Capacity, Capacity building, Managementhelp
Product Information Sheet - DuPont
www.dupont.comclimate. As part of a complete building envelope system, DuPont™ Flashing Tape will help reduce the risk of water damage, increase building comfort, and improve energy efficiency. Air and Water Barrier Performance Tyvek® Tape is strong, easy to use, and highly waterproof. It is constructed of an oriented polypropylene film, coated with a
Guiding Principles for Sustainable Federal Buildings and ...
www.sustainability.govThe six Guiding Principles align with the definition of a high-performance green building established in the Energy Independence and Security Act (EISA) of 2007 (42 U.S.C. § 17061(13)), and serve as guidelines for Federal agencies to assess progress towards the sustainability metrics associated
Federal, Performance, Principles, Building, Sustainable, Guiding, Guiding principles for sustainable federal
2021 - 2022 PERFORMANCE REC. SCORING SYSTEM - …
www.varsity.com2021 - 2022 performance rec. scoring system - building y y receive full credit if they show control through the pop or transition to another skill. 2.0 - 2.5 w uirement 2.5 - 3.0 w eam 3.0 - 3.5 mid eam, e 3.5 - 4.0 high eam, e y 0 oss 5 oss 2.0 onized in the same section y based on a traditional group of 4 or more, rippled or synchronized in ...