Transcription of CHAPTER 11
{{id}} {{{paragraph}}}
Where Required. Roofs, paved areas, yards,courts, courtyards, vent shafts, light wells, or similar areashaving rainwater, shall be drained into a separate storm sewersystem, or into a combined sewer system where a separatestorm sewer system is not available, or to some other place ofdisposal satisfactory to the building Storm Water Drainage to Sanitary sewer water shall not be drained into sewersintended for sanitary drainage Traps Required for Combined water from an exterior area drain, catch basin.
1101.6 Building Subdrains.Building subdrains located below the public sewer level shall discharge into a sump or receiving tank, the contents of which shall be automatically
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
Water, Sewer PVC Schedule 40, PVC Schedule 40, Schedule 40, Water, Submittal Summary Sheet, Miami-Dade, Miami-dade water, SEWER, PRESSURE PIPE, San Antonio Water System Standard Specifications, San Antonio Water System Standard Specifications for Construction, Plastic DWV Pipe and Fitting Dimensions, Chapter SPS 382, WISCONSIN, Installation Guide