Transcription of CHAPTER 15 ROOF ASSEMBLIES AND ROOFTOP STRUCTURES
{{id}} {{{paragraph}}}
CHAPTER 15. ROOF ASSEMBLIES AND ROOFTOP STRUCTURES . SECTION 1501 of the roof deck, and additional slope has been provided to GENERAL ensure drainage of the roof within 48 hours of precipitation. Scope. The provisions of this CHAPTER shall govern the REROOFING. The process of recovering or replacing an design, materials, construction and quality of roof ASSEMBLIES , existing roof covering. See Roof recover and Roof replace- and ROOFTOP STRUCTURES . ment.. Exception: Buildings and STRUCTURES located within the ROOF ASSEMBLY. A system designed to provide weather high-velocity hurricane zone shall comply with the provi- protection and resistance to design loads. The system consists sions of Section and Sections 1512 through 1525. of a roof covering and roof deck or a single component serving as both the roof covering and the roof deck. A roof assembly includes the roof deck, vapor retarder, substrate or thermal bar- SECTION 1502 rier, insulation, vapor retarder and roof covering.
15.2 2010 FLORIDA BUILDING CODE — BUILDING ROOF ASSEMBLIES AND ROOFTOP STRUCTURES. 1504.3.2 Metal panel roof systems. Metal panel roof sys-tems through fastened or standing seam shall be tested in accordance with UL 580 or ASTM E 1592 or TAS 125. Exception: Metal roofs constructed of cold-formed
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}