Transcription of CHAPTER 30 ELEVATORS AND CONVEYING SYSTEMS
{{id}} {{{paragraph}}}
CHAPTER 30 ELEVATORS AND CONVEYING SYSTEMSSECTION CHAPTER governs the design, construction,installation,alteration,rep air and maintenance of elevatorsand CONVEYING SYSTEMS and their :Other administrative and programmatic provisions mayapply. See the Department of Business and Professional Regu-lation [DBPR] CHAPTER 399, FloridaStatutes, and 61C-5,Florida Administrative Code. The regulation and enforcementof the following sections of the adopted codes, and theiraddenda, are preempted to the Bureau of elevator Safety of theDepartment of Business and Professional regulation: , ASME andASME Referenced as otherwise providedfor in this code, the design, construction, installation,alter-ation, repair and maintenance of ELEVATORS and CONVEYING sys-tems and their components shall conform to B44, ASME , ASME , ASME ,ASME , ALI ALCTV, and ASCE 24-05 for constructionin flood hazard Division of Hotels and Restaurants may grant excep-tions, variances and waivers to theEl
CHAPTER 30 ELEVATORS AND CONVEYING SYSTEMS SECTION 3001 GENERAL 3001.1 Scope. This chapter governs the design, construction, installation, alteration, repair and maintenance of elevators
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
2012 International Building Code Handbook, CHAPTER, BUILDING, Venting for Plumbing Systems, International, CODE, Chapter 9 Vents, Commonly used residential building codes, North Carolina Department of Insurance, NCDOI, Building Code, BUILDING CODE REFERENCE STANDARDS, 2003 International Residential Code for One, 2003 International Residential Code® for One