Transcription of CHAPTER 6 ENVIRONMENTAL MANAGEMENT PLAN 6.1 …
{{id}} {{{paragraph}}}
The Tata Power Company Ltd. EIA Report for 1000 MW Coal Based Thermal Power Plant at Naraj Marthapur, Cuttack, Orissa SGS India Private Limited 134 CHAPTER 6 ENVIRONMENTAL MANAGEMENT plan Introduction ENVIRONMENTAL MANAGEMENT plan is the key to ensure that the ENVIRONMENTAL quality of the area does not deteriorate due to the operation of the plant under study. The treatment and disposal of effluents for the plant have been described in CHAPTER 2.
ENVIRONMENTAL MANAGEMENT PLAN 6.1 Introduction Environmental Management Plan is the key to ensure that the environmental quality of the area does not deteriorate due to the operation of the plant under study. The treatment and disposal of effluents for the plant have been described in Chapter 2.
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
CONSTRUCTION AND OPERATIONAL PHASE, Environmental management plan, Construction and operational phase environmental management plan, Construction, Construction Environmental Management Plan, Construction Phase, Operational, 17 Construction environmental management plan, Environmental management, Plan, Environmental, Management plan, Management, Phase, Housing Design Guidelines and Construction Standards