PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: dental hygienist

CHAPTER 7 HEATING, VENTILATING, AND AIR …

TM 5-691 7-1 CHAPTER 7 heating , ventilating , and air -CONDITIONING SYSTEMS _____ 7-1. General heating , ventilating , and air -conditioning (HVAC) design The DOD owns and operates many C4 ISR facilities across the nation and abroad, ranging from small computer rooms to large radar facilities. C4 ISR facilities often house computer and communications equipment, radar systems, printers, disk and tape drive, monitors, and system consoles all of which generate substantial amounts of heat. To optimize performance and ensure continued operation, the environment containing the electronic equipment must be maintained within stringent temperature and humidity levels. In addition, the comfort needs of personnel required to operate the equipment must be met and the airborne particulate matter effectively filtered from entering the C4 ISR room airstream.

a. The information present here is not intended to replace the design analysis. Cooling systems must be designed on a case-by-case basis, with consideration given to such factors as cost, location, and mission criticality of the C4ISR facility. b. With the rapid advancements in state-of-the-art electronics, existing equipment within C4ISR

Loading..

Tags:

  Cooling, Heating, Ventilating, And air, Criticality

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of CHAPTER 7 HEATING, VENTILATING, AND AIR …

Related search queries