PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: bankruptcy

CHAPTER 8 RAILROAD - California Department of …

CHAPTER 8 RAILROAD RAILROADS INTRODUCTION shoring adjacent to railroads present additional challenges in both the review and construction phases. For the purposes of this Manual, the term RAILROAD will refer to the Burlington Northern and Santa Fe Railway (BNSF) and the Union Pacific RAILROAD (UPRR). In the course of the work, SC engineers may encounter other railways such as light rail and commuter trains like Bay Area Rapid Transit (BART). For these other railways, it is acceptable to use the same guidelines presented here unless there are specific instructions from the concerned railway.

10. Slurry type materials are not acceptable as fill for soldier piles in drilled holes. Concrete and flowable backfill may prevent removal of the shoring system. Use compacted pea gravel material. 8.1.5 Information Required (GTS section 4, p3 - 4) Plans and calculations shall be submitted signed and stamped by a Registered Professional

Tags:

  Fill, Railroad, Shoring, Flowable

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of CHAPTER 8 RAILROAD - California Department of …

Related search queries