Page 1 of 18 CHEMOURS CORRECTIVE MEASURES implementation work plan EPA COMMENTS CORRECTIVE MEASURES implementation work plan (CMI WP) Section Introduction 1. Page 1, Paragraph 2 Reference the two technical memoranda dated October 2014 that were utilized in the preparation of the permit modification. Those documents are: 1) Technical Support for the Additional Sediment Removal Areas, Pompton Lake CORRECTIVE Action implementation , Pompton Lakes, New Jersey Technical Memorandum (URS, October 2014a and 2) Technical Support for Acid Brook Delta Upland Soil Areas CORRECTIVE implementation , Pompton Lakes, New Jersey Technical Memorandum (URS October 2014b). 2. Page 5, Installation of a Containment System In sentence 1, indicate the investigation(s) were geotechnical.
Page 1 of 18 CHEMOURS CORRECTIVE MEASURES IMPLEMENTATION WORK PLAN EPA COMMENTS CORRECTIVE MEASURES IMPLEMENTATION WORK PLAN (CMI WP) Section 1.0 – Introduction 1. Page 1, Paragraph 2 – Reference the two technical memoranda dated October 2014 that
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
NYC DEPARTMENT OF ENVIRONMENTAL, Nyc department of environmental protection, Geotechnical investigation, ROLE OF GEOTECHNICAL ENGINEER IN CIVIL, The geotechnical, Geotechnical, Master Repair Guidelines, Investigation, Group tension cyclic loading: Field test, Group tension cyclic loading: Field test programme, DESIGN BY ROCK MASS CLASSIFICATIONS, Introduction, Performing, Design of footings