Compaction of Concrete - Boral
50–90 130–200 0.6–1.3 175–350 6–20 Concrete (less than 80 mm slump) in normal construction, eg walls, floors, beams and columns in buildings. 75–150 120–180 0.8–1.5 300–500 11–31 mass and structural concrete of 0 to 50 mm slump deposited in quantities up to 3m3 in relatively open forms of heavy construction.
Tags:
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
Documents from same domain
Customer Notification Concrete Delivery Requirements
www.boral.com.auhopper, other trucks or stationary objects. Must never stand on the pump truck or straddle between the concrete truck and the pump truck. Our customer must ensure they have a competent person reversing trucks onto the receiving hopper at all times. The primary chute on concrete trucks should only be moved when the truck is stationary.
CONCRETE - Boral
www.boral.com.aubuilt into each mix design and you should be familiar with what constitutes good concrete: 1. Cement and water combine chemically to bond the sand and coarse aggregate together. Ground granulated blast furnace slag and flyash may also be used as cementing materials, but always in combination with cement.
CONCRETE - Boral
www.boral.com.aubuilt into each mix design and you should be familiar with what constitutes good concrete: 1. Cement and water combine chemically to bond the sand and coarse aggregate together. Ground granulated blast furnace slag and flyash may also be used as cementing materials, but always in combination with cement.
Cement Ready Reckoner - Boral
www.boral.com.auThe Ready Reckoner for mortar is a general guide only. For specific engineering properties refer to AS3700 (Masonry Structures) or consult a professional engineer. Mixing Raw Materials Suggested mix proportions by volume Laying Bricks – Estimating How Much to Order Buying Premix Bags Using Brickies Mortar to lay bricks Estimating bags by ...
Product installation guide - Boral
www.boral.com.au7. PRODUCT SPECIFICATION OF TIMBER CLADDING 22 7.1 Species properties 23 8. INSTALLERS INFORMATION 24 8.1 Delivery, storage and handling 24 8.1.1 Accepting delivery 24 8.1.2 Onsite storage 24 8.2 Handling and cutting 24 8.3 Metal work and grinding 24 8.4 Tannin stain minimisation 24 DISCLAIMER Inspect cladding or lining boards before installation.
Designer Block - Boral
www.boral.com.au1/2 bond pattern Cut one block per course to 340mm length to maintain 1/2 bond pattern Cut Fig 11 — Corner Bonding Details Series 200 Split Face Designer Block™ Fig 10 — Sill Detail - Single Skin Series 200 Split Face Designer Block™ 40mm 10.101 cut in half, laid with cut end down. 80 x 40mm bevel cut on top. 80mm 10.01 20.101
Guide to Laying Pavers - Boral
www.boral.com.aucompactor with a piece of carpet or rubber mat under the compactor to prevent the pavers from being scratched or damaged. After each pass of the compactor sweep in more jointing sand and compact again before sweeping off excess sand. (see Figure 10). Figure 10 For small areas, pavers can be compacted by using a hammer and a hardwood plank.
Emergency Response Plan - Boral
www.boral.com.auappears in the Emergency Manual. 1.3 Emergency Preparedness Checklist Checks of emergency preparedness must be undertaken using the set Site Inspection Checklists 35-F02. 1.4 Definitions Crisis Team Personnel appointed by the Operations Manager as appropriate – including senior engineers, HSE Advisor, operational personnel – to assist in the
BORAL ROOF TILES Build something great R O O F T ILES
www.boral.com.auBellcast Batten: (Tilting batten) A batten fixed on the toe of the rafters in a vertical line with the plum cut, to keep the eaves course of tiles on the same rake as the other courses (the fascia board generally serves this purpose). Bond The system …
Hydrated Lime - Boral
www.boral.com.auBoral Cement is a manufacturer and supplier of premium quality hydrated lime. The products purity and surface area facilitate its chemical reactivity ... and impurities like silica, alumina, and iron are a function of the limestone from which the lime is made. Boral Cement’s limestone deposit at Marulan South is of extremely high quality ...
Related documents
REINFORCED CONCRETE FRAME CONSTRUCTION - World …
www.world-housing.netconcrete can be molded into almost any shape, which is an inherent advantage over ... achieve a certain amount of ductility in addition to the required strength. Ductility is one Figure 2: A plan of a typical RC ... when the first floor is left open (that is, no infills) to serve a commercial function
Open, Construction, Required, Concrete, Reinforced, Frame, Strength, Reinforced concrete frame construction, Required strength
Washington, D.C. September 2000 Wastewater Technology …
www3.epa.govfact sheet are ductile iron, concrete, plastic, and vitrified clay. ... pipe fill material, and the required strength of the pipe material. The following list shows background information to be used in determining what type of ... Open cut of roads. 3. Boring and jacking. 4. Concrete encasement of pipe at stream
QUALITY CONTROL MANUAL FOR CONCRETE STRUCTURE
openjicareport.jica.go.jpWith high performance concrete, it is desirable that the specifications be performance-based. Class P(HPC) is intended for use in prestressed concrete members with a specified concrete compressive strength more than 6.0 ksi (approx. 41.4 MPa) and should be always used for specified concrete strength more than 10.0 ksi (68.9 MPa).
CIP 6 - Joints in Concrete Slabs on Grade
www.concreteisbetter.comCracks in concrete cannot be prevented entirely, but they can be controlled and minimized by properly de-signed joints. Concrete cracks because: a. Concrete is weak in tension and, therefore, if its natural tendency to shrink is restrained, tensile stresses that exceed its tensile strength can develop, resulting in cracking. b.
Grade, Joint, Concrete, Strength, Slab, 6 joints in concrete slabs on grade
IS 4990 (2011): Plywood for concrete shuttering work ...
www.paamgroup.com6.4 Plywood for concrete shuttering work shall be preservative treated and bonded with BWP adhesive. When required, concrete shuttering plywood may be supplied with or without any plastic coating or suitable overlay (see 6.7 and 10.1.4). 6.5 When boards of a size larger than the available press size are required, these may be made by scarf
Batching, Mixing, Transporting, and Handling Concrete ...
scetcivil.weebly.comConcrete is sometimes mixed at the jobsite in a stationary mixer or a paving mixer (Fig. 10-2). Stationary mixers include both onsite mixers and central mixers in ready mix plants. They are available in sizes up to 9.0 m. 3 (12 yd. 3) and can be of the tilting or nontilting type or the open-top revolving blade or paddle type. All types may