Transcription of CONCRETE SEGMENTAL RETAINING WALL …
{{id}} {{{paragraph}}}
Rockwood Classic 8 RW Classic 8 Specs March Page 1 CONCRETE SEGMENTAL RETAINING WALL system PART 1: GENERAL SPECIFICATIONS Work Included A. Work shall consist of furnishing and constructing a Rockwood Classic 8 unit SEGMENTAL RETAINING wall in accordance with these specifications to the lines and grades shown on the construction plans and drawings. Alternate wall systems will not be considered. B. Work includes preparing foundation soil, furnishing and installing leveling pad, unit drainage fill, and backfill to the lines and grades shown on the construction plans and drawings. C. Work includes furnishing and installing geogrid soil reinforcement of the type, size, location, and lengths as designated on the construction drawings. Related Sections A. Section _____ - Site Preparation (Not applicable) B. Section _____ - Earthwork (Not applicable) Reference Documents A.
Rockwood Classic 8™ RW Classic 8 Specs March 08.doc Page 1 CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1: GENERAL SPECIFICATIONS
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
CAER, Masonry, Concrete masonry, Moment Resisting Frames with Infill Panels, Concrete, Concrete Masonry Walls & Requirements for, Concrete Masonry Walls & Requirements for Partitions, Wall Selection Guide Section 1, Reinforced concrete, Concrete Flue Liners for domestic, Concrete Flue Liners for domestic chimneys Installation