PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: biology

CONCRETE SUBFLOOR REQUIREMENTS NEW …

Installation InstructionsRigid Vinyl PlankFor Assistance, Call:1-714-685-7568 LevelsAbove Grade / On GradeBelow GradeInstallation MethodClick Please contact 1-800-986-3460 for further : ASBESTOS IN EXISTING floor : This product does not contain asbestos. Existing installed resilient flooring and asphaltic adhesive may contain asbestos fillers or crystalline silica. Do not sand, dry sweep, dry scrape, drill, saw, bead-blast, or mechanically chip or pulverize existing resilient flooring, backing, lining felt, asphaltic cutback adhesive or other adhesive. See Recommended Work Practices for Removal of Resilient floor Coverings ( ) for detailed information and instructions on removing all resilient covering : DO NOT INSTALL IN all exterior installations, seasonal porches, boats, campers, RV's, sunrooms, solariums, non-temperature controlled rooms or homes.

over concrete, sleeper substrates, hardwood over concrete and rubber. Remove these floors and old adhesive before installing new flooring. JOB SITE CONDITION: Prior to installation, the installer must ensure that at the time of installation, the job site conditions including subfloor/substrate, ambient temperature and ...

Loading..

Tags:

  Floor, Concrete

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of CONCRETE SUBFLOOR REQUIREMENTS NEW …

Related search queries