Transcription of CONSTRUCTION GUIDE
{{id}} {{{paragraph}}}
CONSTRUCTION guideFor the installation of conduit, manholes and splice boxesOne call to Miss Utility can savetime, money and you pick up any equipment, pick up the phone and call Miss Utility. Miss Utility will notify all applicable utility companies and see to it that your job site is marked for all underground utility lines. One simple phone call can save you the time and hassle of dealing with job site mistakes and delays. Not to mention decrease liability, prevent damage, reduce injuries and possibly save lives. After all, safety is everyone s Miss Utility, at least 48 hours prior to work, at 811 or Safely CHECKLIST1. Call Miss Utility at 811 or at least 48 hours prior to Allow the required time for utilities to mark the underground Respect and protect all Excavate with care.
The information in this manual provides general guidelines for the installation of conduit, ... BGE’s Underground Cable Systems BGE’S UNDERGROUND CABLE SYSTEMS ARE DIVIDED INTO THREE TYPES: 1. Direct-Buried: ... through each duct prior to BGE cable installation, followed by a pulling line (1800 lb.
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}