Issued by the Director of Energy SafetyWA Electrical RequirementsJanuary 2014WA Electrical Requirements January 2014 Edition1 Energy Safety Division (EnergySafety) of the Department of Commerce, following consultation with network operators and Electrical contracting industry groups in Western Australia, issued this updated version of the WA Electrical Requirements (WAER) which applies from 1 July installation designs commenced after 1 July 2014 must comply with this January 2014 version. Designs started before 1 July 2014, and projects under construction or for which building contracts are signed at that date, may comply with the earlier July 2008 version.
Figure 3.6 Underground network and underground consumers mains Figure 3.7 Typical underground service to multi-lot built strata In addition, network operators should be consulted regarding their connection requirements. 3.2 Earthing System Earthing systems shall comply with the relevant technical standards, including: • the Wiring Rules;
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}