Transcription of CONSTRUCTION INSPECTION REPORT
{{id}} {{{paragraph}}}
CONSTRUCTION INSPECTION REPORT . DIVISION REPORT LAST INSPECTION DATE OF State Job No. County NO. REPORT . Fed. No. INSPECTION MADE BY QUALITY OF WORK PROGRESS OF WORK TIME ELAPSED WORK COMPLETED. Unsatisfactory Unsatisfactory % %. Satisfactory Satisfactory IN COMPANY WITH. (Name, Title). (Check appropriate box). Process Review / Product Evaluation Phase ( INSPECTION -in-Depth) Project Final LOCATION: (fill in the blank). PROJECT DESCRIPTION/WORK TYPE: (fill in the blank). PROJECT INFORMATION: (Acquire a copy of Contract Award Summary once at the beginning of the project).
The bond breaker is placed correctly at or above the minimum thickness and asphalt content. 18. Overall CTB construction and inspection practices appear acceptable and appropriate measurement and payment practices are in place. TxDOT Process for Acceptance of Rigid Pavements Built and Inspected by Other Entities
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}