PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: biology

CONSTRUCTION INSPECTION REPORT - ftp.txdot.gov

CONSTRUCTION INSPECTION REPORT . DIVISION REPORT LAST INSPECTION DATE OF State Job No. County NO. REPORT . Fed. No. INSPECTION MADE BY QUALITY OF WORK PROGRESS OF WORK TIME ELAPSED WORK COMPLETED. Unsatisfactory Unsatisfactory % %. Satisfactory Satisfactory IN COMPANY WITH. (Name, Title). (Check appropriate box). Process Review / Product Evaluation Phase ( INSPECTION -in-Depth) Project Final LOCATION: (fill in the blank). PROJECT DESCRIPTION/WORK TYPE: (fill in the blank). PROJECT INFORMATION: (Acquire a copy of Contract Award Summary once at the beginning of the project). CONTRACTOR (Name). (Address). (City). (Phone). CONTRACT AMOUNT ($XXXX). STATE CONTRACT OR EA NO. (XX-XXXXXX). AREA ENGINEER (Name). (Address). (City). (Phone). (Fax). (E-mail).

TxDOT observer. Signature of TxDOT Observer Observation Date Material Inspection MD X NA Documentation Attached 1. Precast material is verified for conformance with design shown in plans, is from an approved source, and is checked for damage. 2. For cast-in-place, Class A concrete is from an approved mix design. 3.

Loading..

Tags:

  Design, Txdot

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of CONSTRUCTION INSPECTION REPORT - ftp.txdot.gov

Related search queries