Ontario PROVINCIAL STANDARD SPECIFICATION METRICOPSS 510 APRIL 2010 CONSTRUCTION SPECIFICATION FOR REMOVAL TABLE OF CONTENTS SCOPE REFERENCES DEFINITIONS DESIGN AND SUBMISSION REQUIREMENTS MATERIALS EQUIPMENT - Not Used CONSTRUCTION QUALITY ASSURANCE - Not Used MEASUREMENT FOR PAYMENT BASIS OF PAYMENT APPENDICES 510-A Commentary SCOPE This SPECIFICATION covers the requirements for demolition, salvage, REMOVAL , and in-place abandonment, either completely or partially, of those materials and structures so designated, including the requirements for backfilling resulting excavations, trenches, holes, and pits.
510.01 scope . 510.02 references . 510.03 definitions . 510.04 design and submission requirements . 510.05 materials . 510.06 equipment - not used . 510.07 construction