Transcription of CONSULTANT SELECTIONS (2018) - Connecticut
{{id}} {{{paragraph}}}
CONSULTANT SELECTIONS (2018) DATE SELECTED ASSIGNMENT CSO # FIRM 8/31/18 DESIGN SERV. FOR 301-195; PLATFORM REPLACEMENT AT DARIEN STATION 2313 VANASSE HANGEN BRUSTLIN (VHB) (Recent selection criteria does not apply to this assignment) 8/9/18 CONSTRUCTION ENG. & INSP. SERVICES; PROJECT NO. 135-307 2312 BETA GROUP 6/6/18 OPERATIONAL & SYSTEMS ENG. FOR BRIDGEPORT HIGHWAY OPS. CENTER 2311 IBI GROUP (Advertised via legal notice, therefore this assignment is excluded from recent selection ) 5/29/18 CONSTRUCTION ENG.
consultant selections (2018) date selected assignment cso # firm 6/6/18 operational & systems eng. for bridgeport highway ops.
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}