Transcription of D T IC ICSeptember
{{id}} {{{paragraph}}}
D T IC USACERL Technical Manuscript P-91/54. Di ICSeptember 1991. US Army Corps of Engineers S EC2, 99Y. EC 0. construction Engineering Research Laboratory C. AD-A243 662. Factors for Generating Initial construction Schedules by Diego Echeverry This report outlines a Knowledge-Based Systems (KBS). approach to acquiring, formalizing, and representing construction scheduling knowledge. This process formalizes key factors that experienced schedulers use to develop initial construction schedules. This study focused on identifying the factors used to logically sequence construction activities. Four such major factors are: (1) physical relationships among building components ( , supported-by, embedded-in, etc.)
6.5 Work-areas (Construction Spaces) Used in the Prototype to Describe Component Location and Operational Space 78 6.6 Example of Expansion of Structural Frame System for a 6-Story Building 79
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
Fundamentals of Building Construction – Materials, Fundamentals of Building Construction – Materials & Methods, 5th, Construction, Building, PRINCIPLES OF BUILDING CONSTRUCTION: Instructional, Building construction, Fundamentals of Building Construction Materials, Role of Building Construction Project Team, General Building Construction Project Experience, HOW METAL BUILDING INSURANCE COSTS COMPARE, Building Construction / General Maintainer Candidate Information, Building Construction for the Fire Service