Hebel PowerBlock Design and Installation GuideDesign & Installation GuideHebel PowerBlock Design and Installation Guide2It is the responsibility of the architectural designer and engineering parties to ensure that the details in the Hebel PowerBlock Design and Installation Guide are appropriate for the intended application. The recommendations of this Guide are formulated along the lines of good building practice, but are not intended to be an exhaustive statement of all relevant data. Hebel accepts no responsibility for or in connection with the quality of the recommendations or their suitability for any purpose when Introduction Benefits Energy Efficiency Fire Acoustic Design Approach Structure 8 S
Hebel® PowerBlock™ Design and Installation Guide 6 6.0 Design Approach There are 2 methods of construction – typical and tie-down. Typical is the most common method of building whilst the tie-down method is required for cyclonic or high wind areas (as determined by an engineer). This guide provides information for both building methods.
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}